中文 / EN
  • Home

  • About Us

    • Company Profile
    • Development History
    • Honorary Certificate
    • Employees
  • Solution

    • Products
    • Case
  • Technology

    • Technological Innovation
  • News

    • News
  • Service

    • Contact Us

Project Case

Products Case
  • Inner Mongolia Power(Group) Wanchenggong grid-side energy storage power station project

    Site:Ordos, Inner Mongolia
    Time:June 2023
    Project Scale:5MW/20MWh
    Application Scenario:Application Scenario: Aqueous Organic Flow Battery for Grid-side LDES

    This project is invested by Inner Mongolia Power Group and executed by Northwest Electric Power Design Institute Co., Ltd. of Energy China as the EPC contractor. The total project scale is 200 MW / 800 MWh, including a 5 MW / 20 MWh aqueous organic flow battery system, marking the first application of such long-duration energy storage on the grid side. After delivery and putting into operation, the project will enhance the local grid’s renewable energy consumption capability, relieve the pressur…

  • China Huaneng power plant project for hybrid energy storage system joint with thermal power units for frequency regulation

    Site:Luoyuan, Fujian Province
    Time:December 2024
    Project Scale:200kW/400kWh
    Application Scenario:Application Scenario: Aqueous Organic Flow Battery for Hybrid Energy Storage Joint with Thermal Power Units for Frequency Regulation

    This project demonstrates the technical advantages of aqueous organic flow batteries under frequent charge–discharge conditions. With “energy storage hardware” provided by Suqian Time Energy Storage and the “intelligent frequency regulation control system” developed by Xi’an Thermal Power Research Institute Co, ltd, the project integrates intelligent control algorithms and optimized operational strategies to deliver a unified solution, which enables aqueous organic flow batteries to be succ…

  • China Southern Power Grid Energy Storage Project in Guangzhou Validation Base

    Site:Guangzhou, Guangdong Province
    Time:November 2025
    Project Scale:1.25MW/5MWh
    Application Scenario:Aqueous Organic Flow Battery for Grid-side Peak Shaving and Frequency Regulation

    This project is funded by the National Institute of Energy Storage and executed by China Southern Grid Energy Storage as the EPC contractor. The demonstration site is located in Baiyun District, Guangzhou. It adopts a 1.25 MW / 5 MWh aqueous organic flow battery system to validate its capability for peak shaving and frequency regulation on the grid side. The project aims to demonstrates that a single flow battery system can deliver the full range of ancillary services required for grid operation.…

  • China Southern Power Grid Energy Storage Project in Guangzhou Validation Base

    Site:Guangzhou, Guangdong Province
    Time:November 2025
    Project Scale:1.25MW/5MWh
    Application Scenario:All-Vanadium Flow Battery for LDES

    This project is funded by the National Institute of Energy Storage and executed by China Southern Grid Energy Storage as the EPC contractor. The demonstration site is located in Baiyun District, Guangzhou. It adopts a 1.25 MW / 5 MWh all-vanadium flow battery system to verify its capability for peak shaving and long-duration energy storage on the grid side, helping alleviate the pressure that renewable energy places on the power grid.

About Us


Company Profile Development History Honorary Certificate Employees

Solution


Products Project Cases

Technology


Technological Innovation

News


News

Service


Contact Us
Company WeChat Account
Mobile
© 2025 All rights reserved:Suqian Time Energy Storage Technology Co.,Ltd.
RSS Sitemap Disclaimers

Platform support:

Technical Support

  • TEL

    +86-0527-80872888
  • TOP